




Gas Membrane & Protection Validations (Including Radon)
Gas membranes are installed once significant risk of gas to future end users has been identified at a site. Verification is the process which ensures ground-gas protection measures are correctly installed. The process typically involves non-destructive inspections and documentation, with follow up reports submitted to the local authority.
